Profile
DC Fast Charging Corridor – Denny’s Restaurant
DCFC
CHADEMO
J1772COMBO
Charger Ports:
62 kW CCS – 2
62 kW CHAdeMO – 2
6.5 kW Type 1 – 2
https://www.plugshare.com/directory/us/california/blythe
Payment Required
DCFC $0.40/kWh ( $0.50 peak times )
Parking Pay Lot: first 90 mins free then, then $0.10/mi
Level 2 $0.35/kWh ($0.45 peak times) with $2/hr after 3 hour limit.
Check ChargePoint app, as parking fees have changed.
Map
Loading...
No Records Found
Sorry, no records were found. Please adjust your search criteria and try again.
Maps failed to load
Sorry, unable to load the Maps API.
